How we do it

Level 2
Level 2 will build on the foundation created in Level 1. However, the overall impact will be greater as it will involve additional tools, process changes and training. Processes within Engineering will be analyzed, defined, documented and implemented. Finally, the initial steps for integration with other departments and external suppliers will occur.

Things we look at:
Advanced Infrastructure Setup
Part / Drawing Release Levels
Drawing Release Process
Released Drawing Access
Revision History Documentation
Product Data Management Permissions and Access
Moving Parts
Analysis
Piping / Cabling
Flat Patterns
Concept Design
Bulk Items
Collaboration
External Contractors
Images for Publications
Quality Assurance (QA) Inspection Details
Family Tables
Top-Down Design
Large Assembly Management
Collaboration Tools
Additional Training
Engineering Bill of Materials (BOM) Automation

Impact
Increased productivity of Engineering teams
Shortened schedules
Reduced design times and cost
Improved design quality
More thorough analysis
Pride within the engineering department will increase
Expected time to payback is measured in months

 Back

 

   
  What we do  |  How we do it  |  Success Stories  |  Accuer Advantage  |  FAQ  |  Articles  |  Blog  |  Home      © 2004-2007 ACCUER